5521 South 28th Ave. Minneapolis HVAC

The Mille Lacs Band of Ojibwe, Community Development office will be accepting sealed lump sum bids for a residential bathroom renovation located at 5521 – 28th Ave. South Minneapolis, MN. Bids will be due Wednesday April 23, 2025, at 3:00 PM. Bids received will be opened and qualified by the Mille Lacs Band of Ojibwe on Thursday April 24, 2025 at 10:00 AM.

A Pre-Bid site visit can be arranged by calling MLBO Project Coordinator (Jim Carpenter) 320-364-9865.

General Notes:

  1. It is the Contractors responsibility to identify any and all discrepancies in the scope of work, not meeting Industry Standards or that which is inconsistent with the International Residential Code (IRC), and Mille Lacs Band of Ojibwe 2025 MLB Project Specification Book.
  2. All electrical wiring, apparatus and equipment for electric light, heat and power, technology circuits or systems shall comply with the rules of the Department of Commerce or the Department of Labor and Industry, as applicable, and be installed in conformity with accepted standards of construction for safety to life and property. Contractor should provide their electrical subcontractor with sufficient information so that cost of any code required updates are included in their base bid.
  3. Contractor must reconnect all utilities, service panel or service feed. Also includes gas, propane. Include such equipment or materials identified in the pre-bid conference.
  4. Contractor will secure all permits and fees.
  5. Contractor is responsible for a thorough investigation of the scope of work.
  6. Contractor will repair any damage to the property or structure created by the scope of work.
  7. NO WORK SHALL BE PERFORMED UNTIL ALL REQUIRED PERMITS HAVE BEEN ISSUED AND COPIES IN THE POSSESSION OF THE PROJECT COORDINATOR AND /OR MILLE LACS BAND BUILDING OFFICIAL.

Work Scope Description: Unless otherwise noted all work shall be completed according to the 2025 MLB Spec Book.

Full equipment HVAC & Furnace / A-C Replacement:

  1. Demo, disconnect, removal and disposal of existing heating and air conditioning equipment.
  2. Lineset from indoor coil to outdoor condensing unit will be replaced with new.
  3. Condensate pump removal and replacement.
  4. Disconnect sheet metal transition and replace with new custom transition for furnace and air conditioning.
  5. All electrical requirements per code. Confirm breaker amp capacity and provide as required for the new equipment. Wire guage,electrical disconnect, reconnection or complete replacement of electrical whip is required.
  6. City of Minneapolis Permits and Inspections. All HVAC work must be permitted and inspected according to State, Local and or City Codes.
  7. Job-site must be maintained in a safe and organized fashion.
  8. Provide approximately 2 tons of Air Conditioning with new equipment that includes a minimum 10 year warranty on materials and 2-3 year Labor Warranty. Include the WARRANTY DETAILS.
  9. Provide and install new Furnace with approximately 60,000 BTU new equipment. Provide all manufacturer and model numbers as part of Proposal. Include sizing of HVAC Equipment to meet Minneapolis Code.
  10. Provide and install a (7) day programmable thermostat.
  11. Include Concrete Pad for the condenser locate in the back yard.
  12. Open to appropriate brands with minimum 10 year warranty Parts and 2-3 year labor warranty.
  13. Provide pricing for one or more equipment packages depending on your preferred equipment.
  14. Interested bidders must be approved “Mille Lacs Band of Ojibwe” NON-GAMING VENDOR. Please, fill out the attached Non-Gaming Vendor Application and submit to JSmith2@grcinos.com as indicated on the Non-Gaming Vendor information sheet.

Contacts:
Interested bidders shall contact James Carpenter at 320-364-9865 or by email at james.carpenter@millelacsband.com to be included on the bidder’s list in the event that any addendums are issued for this project.

Mobilization and Project Schedule:

  1. The Contractor shall be capable of mobilizing his equipment, crews, and subcontractors within 30 days of a fully executed contract.
  2. Project will be substantially complete within 45 days of fully executed contract.
  3. General contractor expected to immediately, upon receipt of fully executed contract, source all required materials and products required for the project. Contractor must immediately notify project coordinator of items with long lead times that may impact project schedule.
  4. Contractor shall provide means and methods for all building phases of construction.
  5. Liquidated damages for exceeding specified timeframes will be in all contracts.

COMMUNITY DEVELOPMENT/PROJECT MANAGEMENT RESERVES THE RIGHT TO REJECT ANY AND ALL BIDS FOR ANY REASON.

COMMUNITY DEVELOPMENT WILL, TO THE GREATEST EXTENT FEASIBLE, GIVE PREFERENCE IN THE AWARD OF CONTRACT TO INDIAN ORGANIZATIONS AND INDIAN-OWNED ECONOMIC ENTERPRISES.

Bidding notes:

  1. Submit proposal in lump sum (supply and install), not to exceed amount.
  2. All Contractors (including subcontractors) must comply with Davis Bacon wage requirements.
  3. All Contractors must provide the following along with their bid submittal:
    a. Completed and signed MLB Community Development Construction Bid Form
    b. Completed schedule of values (billing worksheet page 2).
    c. A copy of Current MLB Vendor’s License (or a copy of the submitted application)
    d. A copy of Current Insurance Certificate
    e. A copy of Subcontractor/Material Supplier list
    f. A copy of valid State of Minnesota Contractor’s License
    g. A copy of Authorized Signature Sheet (submitted with first bid submittal)
  4. All Contractors must comply with all Mille Lacs Band of Ojibwe American Indian Employment requirements (see 18 MLBSA § 5). Contact Lori Trail at (320) 532-4778. (NOT REQUIRED FOR THIS HVAC PROJECT)

All proposals must be mailed and labeled as follows:

Mille Lacs Band of Ojibwe
Commissioner of Community Development
Sealed bid: 5521 South 28th Avenue Mpls.
PO Box 509
Onamia, MN 56359

Please note that the bids submitted via mail to the P.O. Box. FedEx and UPS will not deliver to a P.O. Box and the Onamia post office will not accept hand delivered items. Please plan accordingly to ensure the timely receipt of your bid submittal. Do not require delivery signature.

**The Band reserves the right to reject any bid that it is unable to collect at the Onamia post office by the bid deadline date and time, provided that the Band has made diligent and reasonable efforts to collect the bid. The Band reserves this right even in the event that the bid has been postmarked before the deadline.

PROPOSALS NOT SUBMITTED IN THIS MANNER WILL BE REJECTED.

Licensing:
Firms must be licensed with the Mille Lacs Band of Ojibwe. A copy of this license (or the license application) must accompany each bid. Licensing process can take several weeks. If you are not currently licensed with the MLBO, please submit a copy of your license application along with your proposal. Contact Jackie Smith at (320)384-4773 or via email JSmith2@grcasinos.com with questions regarding licensing and for the license application.

PERMIT AND CONTRACTOR REQUIREMENTS:

Permits: HVAC Contractors are responsible to attain all necessary permits in accordance to City of Minneapolis, MN requirements. Load calculations must meet Local, State and City of Minneapolis requirements.

There are no Bonding Requirements for this project.

Band Ordinance 07-22 states the following:

For all Band funded residential construction projects, a performance bond is required for contracts in excess of $100,000.00.